When does losing feel like winning?
When you’re nominated for awards that are won by truly outstanding people. GLD Technical Consulting and its founder Laura Dunlop were nominated for two differe...
When you’re nominated for awards that are won by truly outstanding people. GLD Technical Consulting and its founder Laura Dunlop were nominated for two differe...
The key marketing trends for 2021 to start planning for now in B2B and B2C are: innovationdigital experiencesgrowth from partnerships These are just three tre...
It gives me great pride and pleasure to announce we have employed again. Established in January 2018 and incorporated in March 2018, PANDA Plumbing and Heating...
KSH Safety Services offers numerous e-learning courses specifically designed for the hospitality sector. These are: Achieving Food Hygiene Rating Level 5 T...
Ensuring that a building can function as well as it looks Whilst building services change over time, architecture is for life – and needs to be able to adapt t...
Energy. Ventilation. Materials: the importance of great building service engineering to renovations. 80% of the buildings that will be in use in ten years' tim...
In 2018 GLD started working with its first modular client, Simply Modular Solutions.
Like other developers, they found the pull of faster build-times and the ability to guarantee factory-standard quality homes irresistible.
It posed new challenges for GLD. It meant we were involved in a build at an earlier stage and were working with plans for a build rather than with on-site contractors. We had to integrate M&E into design drawings (which we can do via Revit or on paper) and then test the design concepts.
Modular demands high-specs: we were working on 2-bed semis where each bedroom had an en-suite. Our designs included low-voltage lighting and PVs (photovoltaics).
We had to consider the standardisation of kit, including distribution boards, light fittings and hot water cylinders, but interestingly, we also had to design for difference and consider the inclusion of a range of options for end users: for example, showers versus wet-rooms. We had to consider how to package the different specs for different modular ‘builds’ and the instructions for those installing the building services in the factories.
Perhaps surprisingly, our work doesn’t end with planning and design. Even when the same design will be replicated on other projects, construction variances such as site conditions, outside temperature and availability of resources, eg electrical supplies and sewer systems, mean that we have to review the building services for future builds.
This means no matter how much modular takes off, there will always be a role for building services engineers!
🎅 Here comes Christmas! 🎅Join us for a festive Christmas Centrepiece Making Class, where you’ll be shown and guided through how to create your own beautiful,...
Indoor Shades, a local band, are performing at EZ Hampers! This versatile three-piece (sometimes four with a drummer) band brings an eclectic mix of music, sure...
The Konsortia Partnership are groups of local, professional small and medium-sized (SME’s) businesses in property and construction based in Manchester and Prest...
Our crochet come along open to all abilities. Come and join our informal crochet sessions, for anyone that would like a little help or to share their hints & ti...
Whether you are in the early stages and just seeking information or you have been considering adoption for a while, joining us at one of our online information...
Indoor Shades, a local band, are performing at EZ Hampers! This versatile three-piece (sometimes four with a drummer) band brings an eclectic mix of music, sure...