The Impact of COVID 19 lockdown on Carbon Emissions in the UK
As a Country we have been forced into a different way of working, preventing Face to face meetings and increasing the use of Zoom and Microsoft Teams. As a resu...
As a Country we have been forced into a different way of working, preventing Face to face meetings and increasing the use of Zoom and Microsoft Teams. As a resu...
During the COVID-19 pandemic and lockdown restrictions, many of our amazing local charities have been severely impacted with their fundraising efforts due to ca...
The Digital Engineer Education Programme (DEEPer) is a bootcamp style course designed to upskill Lancashire residents and enable them to enter the digital and s...
The Billy Project have set up our self referral scheme for women and girls aged 11+. If you feel lonely or isolated, inactive and unfit and would like to meet...
Would you be able to survive without a wage due to a fracture or injury? #Fracturecover can protect you financially ⚽ It doesn't have to be an #injury picke...
Words from BACKUP North West Director of Business https://backup-charity.org.uk/dont-over-sell-yourself/
In 2018 GLD started working with its first modular client, Simply Modular Solutions.
Like other developers, they found the pull of faster build-times and the ability to guarantee factory-standard quality homes irresistible.
It posed new challenges for GLD. It meant we were involved in a build at an earlier stage and were working with plans for a build rather than with on-site contractors. We had to integrate M&E into design drawings (which we can do via Revit or on paper) and then test the design concepts.
Modular demands high-specs: we were working on 2-bed semis where each bedroom had an en-suite. Our designs included low-voltage lighting and PVs (photovoltaics).
We had to consider the standardisation of kit, including distribution boards, light fittings and hot water cylinders, but interestingly, we also had to design for difference and consider the inclusion of a range of options for end users: for example, showers versus wet-rooms. We had to consider how to package the different specs for different modular ‘builds’ and the instructions for those installing the building services in the factories.
Perhaps surprisingly, our work doesn’t end with planning and design. Even when the same design will be replicated on other projects, construction variances such as site conditions, outside temperature and availability of resources, eg electrical supplies and sewer systems, mean that we have to review the building services for future builds.
This means no matter how much modular takes off, there will always be a role for building services engineers!
Astley Hall Drive, Manchester, Greater Manchester, M29 7TX
01942 889535
View detailsWelcome to our Level 3 Emergency First Aid at Work course! This intensive one-day training program is designed to provide individuals with the skills and knowle...
We’re excited to join voluntary adoption agencies (VAAs) across the UK for Big Adoption Day and, as part of this, will be holding an online event on Wednesday 1...
On Wednesday, 15 January 2025, at 218 Tulketh Road, Ashton, Preston, PR2 1ES from 1pm to 3pm, we’re very excited to open our doors, to join voluntary adoption a...
On Wednesday, 15 January 2025, from 1pm to 3pm, Caritas Care are excited to open their doors to join voluntary adoption agencies (VAAs) across the UK for Big Ad...
On Wednesday, 15 January 2025 we’re excited to open our doors to join voluntary adoption agencies (VAAs) across the UK for Big Adoption Day. If you’re consideri...
Networking, GB Update and New ConnectionsAs our share platforms have continued to grow, so too have our online meet ups! Join us for our next fortnightly meet...